After Eight Months, NRC Resumes Operations At Abuja-Kaduna Railway

Share this post

The Nigerian Railway Corporation (NRC) has resumed operations at the Kaduna-Abuja railway, eight months after they were suspended.

In March, Boko Haram attacked a passenger train along the route, leading to the suspension of service.

Advertisement

But on Monday, operations resumed with the first train leaving the terminal by 9:45 am. The Kaduna-Abuja bound train arrived at the Idu Train Station exactly at 10:22 am.

Share this post

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *